
Little Mix - The SearchThis installation used 27 CRT video screens and 4 channels of synchronised and genlocked video playback via the Pure Energy playout system allowing the screens to be filmed without flicker or tearing. The set was for the band Ychange and was designed to be set-up on stage within 20 minutes. The stacks of screens were on wheels (supplied by the production company). Playback was controlled from behind the set. Here is the final result broadcast on 06-11-2020:
Date : 6th November 2020 |